{"page":{"id":81,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://merrywrap.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-10-29\">October 29, 2026</time></p>\n<p>Holiday orders often change after the checkout button: a new grandchild&#8217;s name to add, a spelling to fix, an address that should have been Grandma&#8217;s instead of yours. Because every Merry Wrap piece is personalised, there is a short window before we start preparing it. This page explains that window, what we can still change inside it, how to ask, and what your options are once it has passed.</p>\n<section class=\"policy-summary\">\n<h2>Changes and cancellations in one glance</h2>\n<ul>\n<li><strong>Window:</strong> 24 hours from the moment you place the order.</li>\n<li><strong>How to ask:</strong> email <a href=\"mailto:support@merrywrap.shop\">support@merrywrap.shop</a> with your order number and the change.</li>\n<li><strong>What we can change:</strong> names and wording, size, style, shape, colour, quantity, the shipping address, or cancel the whole order.</li>\n<li><strong>Cost:</strong> free. Cancelled orders are refunded in full.</li>\n<li><strong>After 24 hours:</strong> the item may already be in production; you can still return it within 60 days of delivery, with free return postage.</li>\n</ul>\n</section>\n<h2>1. Why there is a 24-hour window</h2>\n<p>We do not keep personalised gifts on a shelf. Each paper roll, ornament or stocking is prepared after you order, using the wording in your order notes, and preparation takes 1–3 business days. To make sure a change reaches us before the name is printed or applied, we accept changes and cancellations for 24 hours after an order is placed. That is a full day, which is usually enough time to read the confirmation email, check every name with the family, and notice anything you would like to change.</p>\n<p>The 24 hours are counted from the time on your order confirmation email, including weekends and holidays. An order placed on Friday at 8 p.m. can be changed until Saturday at 8 p.m., even though we do not start preparing it until the next business day.</p>\n<h2>2. How to ask for a change or cancellation</h2>\n<ol>\n<li>Find your order number in the confirmation email. It is also shown in your account if you checked out with one.</li>\n<li>Email <a href=\"mailto:support@merrywrap.shop\">support@merrywrap.shop</a> or use the <a href=\"/submit-ticket/\">Submit a Ticket</a> page. Put &#8220;Change&#8221; or &#8220;Cancel&#8221; and your order number in the subject line, so we can see it first.</li>\n<li>Write the change clearly. For wording, give the full new text for each item, for example &#8220;Ornament 2: change Mia 2025 to Mia 2026&#8221;. For an address, give the complete new address, including the apartment number and postal code.</li>\n<li>We confirm by email once the change is made. Your request counts from the time you sent it, so a request sent within the 24 hours is honoured even if we reply a few hours later.</li>\n</ol>\n<p>Please send changes by email rather than placing a second order with the corrected wording. Two orders for the same gift are easy to mix up and can lead to two pieces being prepared.</p>\n<h2>3. What can be changed within 24 hours</h2>\n<table class=\"policy-table\">\n<caption>Changes we can make before production</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Within 24 hours</th>\n<th scope=\"col\">Cost to you</th>\n<th scope=\"col\">Effect on timing</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Names, dates or wording in the order notes</td>\n<td>Yes</td>\n<td>Free</td>\n<td>None</td>\n</tr>\n<tr>\n<td>Size, style, shape, finish or colour of the same item</td>\n<td>Yes, if the option is available</td>\n<td>Price difference only</td>\n<td>None in most cases</td>\n</tr>\n<tr>\n<td>Add or remove an item</td>\n<td>Yes</td>\n<td>Price of added items; removed items refunded</td>\n<td>None</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>Yes, within the US, Canada, Australia and New Zealand</td>\n<td>Free</td>\n<td>Delivery estimate follows the new country</td>\n</tr>\n<tr>\n<td>Cancel the whole order</td>\n<td>Yes</td>\n<td>Free, full refund</td>\n<td>Not applicable</td>\n</tr>\n</tbody>\n</table>\n<p>If a change moves the order to a different price, we either refund the difference to your original payment method or send you a secure request for the extra amount; we never take an additional payment without asking you first.</p>\n<h2>4. Common changes and how to word them</h2>\n<h3>A new name to add</h3>\n<p>A baby arrives in November and the family stockings need one more name. Ask to add an item and give the new name: &#8220;Add one plush cuff stocking: Rosie&#8221;. We confirm the extra price before adding it.</p>\n<h3>A spelling to correct</h3>\n<p>Write the full corrected line, not only the letter that changes: &#8220;Paper: change Kaitlin to Katelyn&#8221;. It removes any doubt about which name you mean.</p>\n<h3>Different wording on two matching items</h3>\n<p>If you ordered two of the same ornament and want different names on each, number them in your email: &#8220;Ornament 1: Sam &amp; Jordan 2026; Ornament 2: Jordan &amp; Sam 2026&#8221;. We apply them in that order.</p>\n<h3>Shipping straight to the recipient</h3>\n<p>You meant the parcel to go to Grandma in Ontario but entered your own address. Send her full address within 24 hours and we will change it. Remember that delivery estimates and any import charges then follow her country.</p>\n<h2>5. A checklist before you click &#8220;Place order&#8221;</h2>\n<p>The easiest change is the one you never need to make. Most December change requests we receive come from a handful of small slips, and a two-minute check at checkout prevents nearly all of them:</p>\n<ul>\n<li><strong>Count the names.</strong> If you are ordering five stockings, make sure the order notes list five names, numbered in the same order as the items in your cart.</li>\n<li><strong>Check the year.</strong> Ornaments and first-Christmas pieces usually carry a year. Typing last year&#8217;s date out of habit is the single most common slip we see.</li>\n<li><strong>Spell nicknames as the family does.</strong> &#8220;Gigi&#8221;, &#8220;GiGi&#8221; and &#8220;G.G.&#8221; all look different on an ornament. If a name has an accent or an unusual capital letter, type it exactly as it should appear.</li>\n<li><strong>Say whether the wording repeats.</strong> For family-name paper, write &#8220;repeat: The Millers&#8221; so we know the same wording runs across the whole roll.</li>\n<li><strong>Mention photos.</strong> If a design uses a photo, write &#8220;photo by email&#8221; in the note and send the picture to us with your order number straight after checkout.</li>\n<li><strong>Check the address.</strong> Gift going straight to someone else? Their name and address go in the shipping fields, your email in the contact field.</li>\n</ul>\n<h2>6. An example timeline</h2>\n<p>Here is how the 24-hour window works for a typical order, so you can see where a change still fits and where a return becomes the better option.</p>\n<table class=\"policy-table\">\n<caption>Example: order placed on a Monday at 9 a.m. Pacific time</caption>\n<thead>\n<tr>\n<th scope=\"col\">When</th>\n<th scope=\"col\">What is happening</th>\n<th scope=\"col\">Can you change or cancel?</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Monday 9 a.m.</td>\n<td>Order placed, confirmation email sent</td>\n<td>Yes, free</td>\n</tr>\n<tr>\n<td>Monday afternoon</td>\n<td>You notice a name is missing and email us</td>\n<td>Yes, free</td>\n</tr>\n<tr>\n<td>Tuesday 8 a.m.</td>\n<td>Still within 24 hours</td>\n<td>Yes, free</td>\n</tr>\n<tr>\n<td>Tuesday 9 a.m. onward</td>\n<td>Window closed; your items may be in preparation</td>\n<td>Ask anyway; otherwise return within 60 days of delivery</td>\n</tr>\n<tr>\n<td>Within 1–3 business days</td>\n<td>Order prepared and handed to the carrier, tracking emailed</td>\n<td>Address redirect requests only</td>\n</tr>\n<tr>\n<td>7–14 business days later</td>\n<td>Parcel delivered</td>\n<td>Return or exchange within 60 days, free postage</td>\n</tr>\n</tbody>\n</table>\n<h2>7. After the 24 hours have passed</h2>\n<p>Once the window has closed, your order may already be in production, and a personalised piece cannot be changed once the name is on it. You still have good options:</p>\n<ul>\n<li><strong>Still ask.</strong> If the 24 hours have only just passed, email us anyway. If we have not started your item yet, we will make the change; if we have, we will tell you honestly.</li>\n<li><strong>Return it when it arrives.</strong> Every item, personalised or not, can be returned within 60 days of delivery for a full refund, and return postage is free. See our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a>.</li>\n<li><strong>Exchange it.</strong> Ask for an exchange with the corrected wording, size or style once the original arrives.</li>\n<li><strong>Address changes after shipping.</strong> We can ask the carrier to redirect the parcel, but cannot promise they will. If it comes back to us, we reship it once you confirm the address.</li>\n</ul>\n<h2>8. Refunds for cancelled orders</h2>\n<p>A cancelled order is refunded in full: the item price, and there is no shipping charge to deduct because shipping is always free. We send the refund within 7 days of confirming your cancellation, to the payment method you used, and email you when it is on its way. How long your bank takes to show it is explained in our <a href=\"/refund-policy/\">Refund Policy</a>. If you prefer store credit, tell us; Merry Wrap store credit never expires.</p>\n<h2>9. When we cancel or pause an order</h2>\n<p>Occasionally we need to contact you before we can go ahead, for example when the order notes are empty on a personalised item, the wording is unreadable or too long to fit, a photo mentioned in the notes has not arrived by email, or the address is outside the four countries we ship to. We email you and pause the order. The preparation time of 1–3 business days starts again once you reply, so a quick answer keeps your gift on schedule.</p>\n<p>If we cannot reach you after several emails, or the order cannot be made as requested, we cancel it and refund the full amount within 7 days. We will never change your wording on our own, guess at a name, or cancel an order without telling you first.</p>\n<h2>10. Changes to orders shipping to Canada, Australia and New Zealand</h2>\n<p>The 24-hour window is the same wherever you are, and it is measured from the time on your confirmation email, not from your local business hours. Because our team works on US Pacific time, an order placed from Sydney or Auckland in the evening may land while we are asleep; that does not shorten your window. Email us whenever you notice the change, and the time your email was sent is what counts.</p>\n<p>If you move a parcel from one country to another within the window, for example from your own address in Seattle to a cousin in Vancouver, British Columbia, the delivery estimate stays at 7–14 business days in transit, but the parcel now crosses a border. Import charges set by the destination country, if any, are paid by the recipient. Tell the recipient a parcel is on its way so a carrier notice does not catch them by surprise.</p>\n<h2>11. Why we cannot change an item after it is made</h2>\n<p>Once a name is printed on paper or applied to an ornament or stocking cuff, it cannot be removed or altered without damaging the piece. That is why the window exists, and also why we never edit wording on our own. If the 24 hours have passed and your piece is already made, the return and exchange process is the right route: you lose nothing but a little time, return postage is free, and the corrected piece follows our normal preparation and delivery times.</p>\n<h2>12. Gifts and orders placed by someone else</h2>\n<p>For privacy reasons, we can only change or cancel an order at the request of the person who placed it, from the email address on the order. If you received a gift and want a different name or style, ask the person who ordered it to contact us within 24 hours, or use the 60-day return and exchange process once the gift has arrived.</p>\n<h2>13. Cancelling a payment instead</h2>\n<p>Please do not ask your bank to block or reverse a payment to cancel an order. That does not stop production, and it can delay your refund. Email us within 24 hours instead and the cancellation and refund are handled directly.</p>\n<h2>14. Questions</h2>\n<p>We answer change and cancellation emails first, within 24 hours on business days. Write to <a href=\"mailto:support@merrywrap.shop\">support@merrywrap.shop</a>, open a <a href=\"/submit-ticket/\">support ticket</a>, or browse the <a href=\"/help-center/\">Help Center</a> and <a href=\"/faqs/\">FAQs</a>. For delivery estimates after a change, see <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a>. Merry Wrap, 4317 NE 66th Ave, Vancouver, WA 98661, US.</p>\n","visible_characters":10602,"meta_description":"Change names, options or the address, or cancel a Merry Wrap order within 24 hours of ordering. Cancelled orders are refunded in full within 7 days.","parent":null,"published_at":"2026-10-29T13:52:40+00:00","updated_at":"2026-10-29T13:52:40+00:00"}}